Press Archive

New12.2.2010

Disney Cruise Line's exhibit in Visitors Center

Papenburg, 12 February 2010 - Starting today, another attraction is waiting for visitors to MEYER WERFT: Disney Cruise Line's (DCL) recently opened exhibition in the Visitors Centre reveals information about the shipyard and the cruise ships under construction.

It is understood that the visit to the shipyard ends with a highlight, namely a view into the covered building dock where the "Disney Dream" is being built. She is one of two ships MEYER WERFT is building for Disney Cruise Line.

The newly built theme area in the Visitors Centre of MEYER WERFT completes the previous exhibition and the yard tour event. Especially for families and children this area is very attractive. A visit to the yard including a tour headed by a competent guide and a visit to the Disney exhibition will approximately take 2.5 hours.

Along with this new offer for families and children, the "floating classroom" represents another topic tailored to students of primary schools. The tours are guided by personnel especially trained in education.

00
01
00
open
New4.2.2010

Delivery of AIDAblu

Fourth Club Ship for German Market Leader AIDA Cruises

Papenburg, 4 February - Today the 71,300-gt club ship AIDAblu was delivered to the owner AIDA Cruises (Rostock) in the port of Emden.

The AIDAblu is the fourth ship out of a series of six club ships the Papenburg shipyard is building for AIDA Cruises. She is tailored to the German market, and combines plenty of comfortable and tasteful interiors with state-of-the-art technology. Next to innovative design this club ship offers the passengers a wealth of special features and comfort. Well over 65 per cent of the cabins are outside cabins, the major part having their own balconies. One of AIDAblu's highlights is the first-time-ever brewery installed onboard a passenger vessel, where beer especially created for the AIDAblu is brewed. Moreover this ship offers the presently largest spa area worldwide on a cruise ship. On 2,600 sqm there are plenty of sports, fitness and wellness facilities. The total number of 34 spa cabins and five spa suites do not only stand out for their elegant, Japanese-style design, but also for their special amenities and numerous services that are included, such as a personal wellness consultant.

Both safety and entertainment meet the latest technical standards ensured by the diesel-electric propulsion system, interactive communication systems and sophisticated stage technology.

Upon delivery to the owner, the AIDAblu will leave the Lower Saxony port of Emden on 4 February 2010 for Hamburg, where she will be christened by the designer Jette Joop on 9 February 2010. Subsequently the new ship in the AIDA fleet will set sail for her maiden voyage to Mallorca.

AIDAblu - Main Particulars

Tonnage71,300 gt
Length overall252 m
Breadth moulded32.2 m
Number of decks15
Draught7.30 m
Engine output totally 36,000 kW (approx. 48,960 hp)
Propulsive power25,000 kW (approx.34,000 hp)
Speed22 knots
Passengers 2,192
Number of passenger cabins 1,096
Number of outside cabins722
Number of inside cabins374
Crew approx.600
Number of seats in Theatrium approx.1,100
Number of restaurants7
Number of bars/lounges13
Flag Italy

Classification

Germanischer Lloyd ✠100 A 5 "Passenger Ship" IWMCAUT RP3- 50% / GL
Total weight of applied paintapprox. 200 t
Total length of cables laid1,700 km
Fuel tanksapprox. 2,500 t
Carpet29,500 m²
Parquet floor2,000 m²
PVC floor3,700 m²
Tiles4,500 m²
Outside glass surfaces4,200 m²
Glass wall (Theatrium)approx. 400 m²
Size of "AIDA eye"150 m²
Length of "AIDA mouth"16 m
Length of "AIDA trail"140 m
Lighting fittings36,263 pcs
LED lights186,624 pcs

Cabins and Suites

The suites are located in the forward and aft parts of the ship on decks 6-9 and on deck 12. They have complete bathrooms with jacuzzi bathtubs and separate showers. Almost all suites have their own balconies offering an unobstructed view of the sea: comfortable suites tailored to the guests' needs. Special spa cabins having direct access to the Body & Soul Spa count among the highlights of the new wellness amenities on offer. The guests in these comfortable cabins and suites on deck 12 come to enjoy exclusive extras such as a Body & Soul package including massage, yoga class and personal consulting by a Spa Butler.

Body & Soul, Wellness Oase (Decks 11 and 12) Never has there been so much space for recreation and sports: Treat your body and soul to the best things in life on 2,600 sqm. The "Wellness-Oase" is the point of rest, a paradise where the guests find relaxation and recreation. Whether dreaming in the hammock or in lounge chairs, or taking a dip in the jacuzzi - anything is possible independent of the weather in the glass-walled pool area covered by a sliding roof. No matter what the weather is like, here the climate is perfect every day. The spa area, which offers a view of the sea, has 15 treatment rooms for shiatsu, massage, thalasso therapy and hot-stone massage. Spacious resting areas, various theme saunas having their own outside spaces, as well as a private spa area with lounger and a separate balcony complete this wellness area. Those keen on sports find the right place on deck 11, featuring the sports court, golf tee boxes, volleyball courts and jogging tracks. There is even a separate event court for sports tournaments.

Theatrium (Decks 9-10-11) The space layout of the Theatrium is excitingly new and unique - the vibrant heart of the ship. Theatre, bars and a market place are merged to a one-of-a-kind space over three decks and a surface of more than 3,000 sqm. The Theatrium is a quiet place in the morning, a central meeting point during the day, and a stage in the evening. The magnificent, light-flooded room has a very special atmosphere due to the huge glass walls, a big glass dome, freely suspended decks and an impressive column construction. The Theatrium is equipped with a large, state-of-the-art stage system. The lower machinery consists of a circular stage including a fall protection device that is automatically operated along with the stage. A lifting stage comprising three platforms forms the connection with the main stage; each platform can be operated separately. Moreover a main stage lift is installed on the main stage. The upper machinery consists of a total of eight rails, a movable LED wall as well as a lift for the artists. All drives are computer-controlled and can be operated from different positions.

Brauhaus (Deck 10) This is the first "sea-going" brewery. Beer is brewed in accordance with the German Purity Law. Up to 500 litres can be brewed per day. Four ingredients are required for brewing beer: water, malt, hopes and yeast. The sorts of beer fresh from the tap, which are produced "live" in a glass brewery, are served along with hearty food. This area meets all the requirements of the Unites States Public Health (USPH) authority, like all other service areas on board.

Propulsion System and Power Supply Four diesel generators, each having an output of 9,000 kW, ensure power generation on board. The diesel engines, type MaK 9M43C, can be operated with both diesel oil and heavy fuel oil. What is new about the engines is the reduced rate of pollution and decreased consumption. The engines are designed for fuels having a low sulphur content, hence meeting the latest exhaust gas limit values. The exhaust gas values are even more improved by the innovative MaK FLEXCAN system.

The Siemens generators produce a voltage of 11,000 v, and provide the ship and its general consumers, the AC plant, thruster plants, lighting system etc, as well as the two propulsion motors made by Siemens with an output of 12,500 kW each. Water Supply and Disposal Up to 1.5 million litres of potable water per day can be generated on board of the AIDAblu. The potable water is generated by means of two evaporators and a reverse osmosis plant. Saving as much water as possible is technically implemented, for instance, by collecting the condensate water in the AC plant and further using it as process water in the laundry. The hot water cycle is heated by steam. Potable water can also be taken on board via the shoreside bunker stations.

Waste Water System and Waste Recycling The complete black water is conducted to two vacuum plants via a vacuum pipe system, where it can be intermediately stored in tanks as required. The black and grey water produced is biologically reprocessed in a bio-reactor, and re-dispensed in process water quality.

All of the waste water (1,000 cbm/day) from the vacuum toilets (black water), the grey water from the cabins, galleys, and the laundry, as well as the residual water from leftovers and the bio-slduge reprocessing is recycled in a central waste water reprocessing plant in a state-of-the-art process (membrane process). At present the purified waste water is meeting the stiffest international environmental regulations, the so-called "Alaska regulations", as well as the German regulations on ground water. The bio-sludge produced and the leftovers are drained, dried and burned in the onboard waste incinerator, along with the residual waste. Recyclable material such as paper, tins and glass is shredded in recycling plants, pressed and disposed of in the ports as recycling material.

00
01
00
open
New29.1.2010

MEYER WERFT presents Award to Best Suppliers

00
01
00
open
New18.12.2009

Float-out of AIDAblu

Papenburg, 18 December 2009 - The AIDAblu, the fourth club ship for AIDA Cruises, is going to be floated out of MEYER WERFT's covered building dock I in the morning hours of 5 January 2010.

The manoeuvre will begin around 7 a.m. The ship will leave the dock in one go this time since the funnel is already mounted while the ship is still in the dock. The AIDAblu will be moved in the harbour around 9 a.m. where she will undergo a couple of different tests. She is likely to be berthed alongside the yard's pier around 4.30 p.m.

Changes of the float-out time schedule may occur due to weather conditions.

With the ship berthed at the pier, outstanding work and more tests and trials will be completed in the coming days. Following the undocking the first crew members will move into their quarters on board. The ship will be conveyed down the river Ems to her sea trials port in Emden on 16/17 January 2010.

The 71,100-gt ship is 252 m long and 32.20 m wide. She has 1,087 cabins and can reach an operating speed of more than 22 knots.

00
01
00
open
New13.12.2009

Bestowal of Highest German Technology Award

Bernard Meyer receives

Werner-von-Siemens-Ring

Papenburg, 13 December 2009 - Today Bernard Meyer, Managing Partner of MEYER WERFT, was awarded the Werner-vonSiemens-Ring. Every three years this highest German technology award pays tribute to persons who have made outstanding contributions to technical sciences. The Werner-von-Siemens Foundation decided to award the ring to the shipbuilder Bernard Meyer for his noticeable achievements as a German engineer and the ground-breaking technical solutions developed under his guidance and implemented in his state-of-the-art shipyards in Papenburg and Rostock. Bernard Meyer is now standing in line with icons of engineering and technology such as Carl Bosch, Konrad Zuse and Wernher von Braun. "I consider this award a special recognition of the performance of the complete MEYER WERFT team and all our partner companies as well as the overall German shipbuilding industry," Bernard Meyer said in his speech on the day of the award ceremony that took place in Berlin.

00
01
00
open
New30.10.2009

New Disney Cruise Ship Setting Sail in 2011

00
01
00
open
go to press portal